Sunday, May 22, 2011

Got Wood? II

A couple of hardwood areas needed special repairs. Apparently, during the carpeting process the installers felt it necessary to remove a few floorboards, which they patched with plywood. That's fine if it's hidden under a carpet but not so cool if you're gonna be exposing the floors.

Trouble is, that flooring isn't made anymore. It's all American white oak cut in two-inch by half-inch boards with tongue-and-groove. Oak flooring isn't hard to find, but it's tough to get the right dimensions. Modern T&G flooring is either wider, thicker, or both. We needed an exact match.

None of the local lumberyards had any good options, and the local floor stores came up dry, too. A local mill could make 'em for us, but the price would be prohibitive. Finally, we came across one source that could get us a small amount (about 20 square feet) if I paid in cash and didn't need a receipt. My favorite kind.

A little cutting, trimming, and shaping later, we've got our replacement boards. They don't seem to take stain quite as readily as the original boards, but that may be because they're newer/younger. We're pretty sure this floor was originally laid in 1936, so the wood itself is probably around 100 years old. A second stain coat may do the trick.

Here you can see the new and old boards together. The foreground and upper left are old wood; the upper right has the new stuff. There's a seam between the two areas because that's how we found it. The previous owners had evidently cut the floor and/or moved a wall in this area. We can't eliminate the cut but at least we can match the wood as closely as possible and then put a threshold strip over the seam.

The Sands of Time

After ripping out all the second-floor carpet, we chemically stripped (most of) the goo that was holding down the carpet padding. Some rooms were worse than others, but they all needed attention.

That job completed, the next step was to sand down the floors and (we hoped) sand off the last remnants of goo that the toxic sludge couldn't take off. We rented the very same floor sander we used last May--exactly one year ago!--and hauled that sucker upstairs again.

Now a year older and wiser, we knew ahead of time that sanding around 800 square feet of floor space was gonna generate a lot of dust. So we taped off the doorways and put towels under doors to minimize the mess. There's no way to prevent the sawdust from going down the stairs, so we just... hoped. After sealing off everything as best we could, Kathy vacuumed up, as you can see.

I gotta say, 60-grit sandpaper under a 200-pound floor sander tears through rough patches pretty durn quick. It took off the worst of the adhesive goo real nice. Very encouraging. But after the first initial scrape, it starts to get boring and tedious. And it makes my hands go numb.

We did three rooms, and each room got sanded three times, each time with finer sandpaper. The sandpaper disks load up with dust pretty quickly, so you have to stop often and clean off or change the sandpaper. The weekend rental for the floor sander was about $75; we spent over $120 on sandpaper for it and filled an entire wastebasket with discarded discs.

But the end result was pretty nice: smooth floors stripped of any goo, gunk, glue, or residual stain. Now for the fun part.

Wednesday, May 18, 2011

Roof-Roof


The garage is coming along. We're on Week Four now, and the roofing materials were delivered and installed. We have a waterproof roof now, which is a good thing because it started raining a few days ago. Very unseasonable for May, but there you go.

The flat top is gone, replaced with a peaked roof. The overall idea is to match the style of the house, and we're pretty close. The main roof is steep: a 12/12 or 45-degree pitch. The city won't allow us to do that on the garage because it would violate some height ordinance or other, so it's 6/12, or half as steep. A steeper roof would have given us more storage underneath, but this is okay, too.


You can't see it from the pictures yet, but there's a lot of detail work going on inside the triangular gable area facing the street. That will ultimately get trimmed out to match the house, too, which requires a lot of molding and shingles and fussy bits. Then, a small window will get set into the gable, with a matching vent (but no window) on the opposite end for ventilation.


The old flat roof was recessed below the tops of the concrete walls; the new peaked roof sits on top of the walls. From inside the garage, the "ceiling" is about a foot higher than it used to be, and that's not even counting the peaked area. That also gives us more storage space (and headroom) inside the garage. Enough for a four-poster car lift...

But that's for another day.

Thursday, May 5, 2011

Garage

It's ironic, really. The more we do to the house the less time we have to write about it.

It's been more than a month since our last installment, but that's not because we've slacked off. Just the opposite, actually. We're still working on the wood floors, finishing up the bathroom, we completely redocorated the master bedroom, worked on some details in the laundry room, and -- the big new project -- started remodeling the garage. Kathy's been busy with tax season and my racing season has just started. Never a dull moment.

You'll recall that the garage was, shall we say, butt ugly. Even the City of Pacific Grove agreed, granting us rare permission to demolish an historic structure, calling it "an eyesore" during the official public hearing. It hasn't been used as a garage in decades, acting instead as a storage shed for the most recent restaurant(s). It couldn't accommodate a car, much less two. There was a rotted man-door on one side and decrepit swing-out doors on the other that hadn't been opened in years. I replaced some of the rotted wood and put on new hinges a few months ago, which turned out to be a complete waste of time because we haven't opened the doors since.

We decided not to demolish the garage because we'd only be able to replace it with one exactly the same size. Even though it's undersized by modern standards (about 19x19 instead of 20x20), that's close enough for our two cars once we get proper doors on.

The really ugly part is the roof, however. It's flat-topped tar paper. The whole structure looks more like a concrete bomb shelter than a garage, and our neighbors (with one exception) seem thrilled we're redoing it. The plan is to put a peaked roof on top and two sets of swing-out carriage doors on the front. We'll cover the poured concrete exterior with wooden ship lap siding, just like the first floor of the house. When it's done, the garage should look more or less like it belongs to the house, and to the rest of the neighborhood.

Permits took several months, but demolition and construction finally started last week (late April). The flat roof came off in a few days, followed by framing of the new roof. Because we're removing the center concrete support from the front of the garage, it needs an engineered steel beam to reinforce the opening. That arrived yesterday and got installed under the watchful eye of an inspector. It's bolted, screwed, epoxied (and probably duct-taped) in place over the front opening where the doors will go.

From inside the garage, the "ceiling" is about a foot higher than it was before, because the new roof sits on top of the concrete walls instead of being set inside the walls. That will give us a bit more storage and headroom inside, but the real benefit will be overhead. The peaked roof will give us a few hundred cubic feet of much-needed storage.

The new peaked roof will cover only the front two-thirds of the garage. The back third will be flat, like a deck. That's because the garage is too close to the house to accommodate a peaked roof all the way around without interfering with the house's roof. It'll look normal from the street, and give us a small raised deck on the sunny side of the house. We're looking forward to it.

Tuesday, March 22, 2011

Floor Wars III

First, there was the bedroom.

Then came the kitchen.

Now it's time for the dining room. And this time, they're not taking any prisoners.

Floor Wars III: Chemical Warfare.

We've always wanted to remove the carpet from the second-floor rooms. We did the master bedroom almost a year ago (has it really been that long?) and the kitchen floor got redone (or revealed, really) just a few months ago. The carpet's old, red, and badly stained. Running a restaurant will do that. No amount of cleaning would get the big lasagna spills off the carpet. So out it goes!

We took a little peek under the dining room carpet a few months back. We were hopeful that we'd find hardwood underneath, like we did in the bedroom. And so it turned out to be: nice oak planks under the padding and tack strips.

On Sunday Kathy and I took a knife to the dining room carpet and ripped it out in chunks. It was all over in less than an hour. (Hey, we're getting good at this!) But alas, the floor was badly stained; it was even worse than the paint splatters we'd found on the bedroom floor. This one's got big splotches of green adhesive goo. It's the consistency of green Crayola crayon melted all over the wood.

Our trusty eco-friendly orange-flavored stripper hardly did anything to it. It smelled nice, but it just wasn't taking the adhesive off. So we called out the big guns. I got some extra-nasty stuff from "Uri." It comes in cans labeled in Russian, straight from Chernobyl. The fumes make you see things. The can gets warm for no reason. You have to throw the brushes away after 15 minutes. This stuff works.

Even so, it took four coats to remove the larger spills. I put it on, stand back for 20 minutes, then scrape the green mutagenic ooze off into a bucket. Lather, rinse, repeat. I'm afraid to leave it on the bare wood; it'll probably start a fire.

At any rate, the floor is mostly stripped now, as are my fingers. My normally reliable nitrile gloves disintegrated on my hands. I found it's better to work bare-handed, because then at least you remember not to scratch your nose.

Once the evil smell subsides we'll follow the usual pattern: sand, stain, and topcoat. We're going to match the stain we used in the bedroom because we like it and because we want the floors on this level to match. Changing stains between rooms would just look weird. Like having green splotches in your dining room.

Wednesday, March 16, 2011

Before and After: Door


One of the many small projects I've been working on is the laundry room door. This is upstairs, just off the kitchen, and leads to the outside stairs (which are now gone). Like everything else in this little laundry room, the door was ragged and nasty.

It has some panels of colored glass in it, which is nice, but the window putty was falling out and the wind whistled around some of the glass panes. The woodwork was in bad shape, too. In particular, the lower left panel was missing entirely and had been boarded up with a sheet of plywood. You can see it here in the "before" picture.

I took out each of the nine glass panels, scraped off all the old putty, cleaned the glass, put them back in, put in new glazier's points and replaced all the putty. This took a lot longer than I expected; puttying takes a long time!

Then I fabricated a new wooden panel out of MDF. Since the original panel used tongue-and-groove, there was no way to insert a new panel without taking the entire door apart. It's kind of like one of those 15-square puzzles. So I made the panel out of eight interlocking pieces (four inside and four outside) so that it fit snugly into the opening and was the same thickness as the originals. Then I glued the raised piece into the middle after routing and beveling it to match the others. A little bead of caulk softened the edges enough that the center piece looks like part of the main panel and not glued on.

I also took off the brass doorknobs and hardware and stripped the paint off everything. This plate was completely white before; it had been painted over--many times--and was nearly invisible against the white door. A little stripping, scraping, and polishing and now they look pretty good.

Some of the smaller wood trim pieces have small details that 20-odd layers of paint had obscured. I stripped these as best I could, with multiple applications of eco-friendly wood stripper, but in the end I resorted to scraping with a screwdriver and pick. I got most of the old paint out, but not all.

Now I've glued, nailed, and puttied everything back together and slapped on a bit of primer. Here's the almost-finished door, with the new panel on the left and the original on the right. Not bad, huh?

I'll wait for the putty to set before I paint the top half of the door. I don't want to disturb the glass while I scrape away paint splatters. Besides, it gives me an excuse to take some time off from the door.

Tuesday, March 8, 2011

Up the Non-Staircase


Demolition is always more fun than construction.

It's usually easier, too. Or at least, is requires less skill and finesse. I can hit, beat, and break stuff with the best of 'em. Today's example: our back staircase.

These stairs went from the backyard up to the second-floor laundry room. They turned the corner around two sides of the house, as you can see. They're not original; they were built in the 1930s when the house was converted into two apartments. The second-floor renters needed a way to get in/out of their upstairs unit without disturbing the ground-floor occupants,. Hence, these stairs.

They were built entirely of redwood, just like everything else in the house. Sadly, even redwood decays over time and these things had to go. In fact, they were officially condemned by the city before we even bought the house. It's all we could do to close the deal without demolishing them first. But we did have to promise to never, ever use them. (I promise. Cross my heart.)

Because of that, the city had no problem approving our plans to rebuild the steps in a different location. We never did like these stairs much, and probably would have demolished them eventually anyway. The red-tag notice from the city just gave us a convenient government-approved excuse.

That's a lot of redwood to throw away. Some of it was fine. A few of the boards came off in one piece and were still bright salmon-pink inside. Others were rotted through and really needed to go. Naturally, the rotted boards came off easily. It's the good ones that were hard to remove.

At any rate, the upstairs door is now locked shut, and I've nailed a few 2x4's across the doorway just in case. We're this close to starting on the new stairs (at least, that's what the builder keeps telling us) so we figured it was time to take these down. Besides, the weather was nice and it's always fun to destroy stuff.